TAKE ACTION: The future of bus rapid transit in Montgomery County

CSG won Montgomery County’s 2013 Countywide Transit Corridors Plan, which envisioned a new Flash bus rapid transit (BRT) system along major roadways. We’ve advocated to implement the plan ever since, and this past month we won actual construction funding for BRT on Veirs Mill Road and MD-355 between Germantown and Rockville! These, along with other routes, are moving forward with planning, design, and construction.

BRT is a higher quality bus service that operates more frequently; has limited stops; runs in a dedicated bus-only median or curb lane; and offers features like all-door boarding, wi-fi, and off-board fare collection. Montgomery’s first Flash route opened along US-29, although it doesn’t have dedicated bus lanes (working on that!).

See below for many, many opportunity to get involved and provide input on the upcoming BRT projects! When providing input, we’d urge you to share the following:

  • Prioritize median, dedicated bus-only lanes — this is the gold standard for BRT and keeps buses fast, reliable, and out of traffic
  • Routes should connect the places where the most people live and work
  • Bus stops should be easy and safe to access for people walking and biking

MD-355 (Rockville Pike)

The MD-355 will connect Clarksburg, Gaithersburg, Rockville, North Bethesda, and Bethesda. The project is in the preliminary engineering phase and seeking feedback. Residents from anywhere in the county can take the feedback survey.

Visit the MD-355 BRT project website

New Hampshire Avenue

New Hampshire Avenue BRT would connect Colesville, White Oak, Adelphi, Silver Spring, and other communities along the corridor. This route is in the study stages, and they need community feedback on station locations and other features. Register for the online meeting, and/or arrive anytime during the open house hours!

Visit the New Hampshire Ave BRT project website

North Bethesda Transitway

The North Bethesda Transitway will connect the Montgomery Mall Transit Center to either the White Flint or Grosvenor-Strathmore Metro Station. The county want your input on the termini point and stop locations. Register for the June 9 or June 21 online open house, or attend the June 13 in-person open house.

Visit the North Bethesda BRT project website